Add remote valves to every field
Keep the controller you already trust
Your SCADA connects to a standard Modbus TCP Server on port 502
and your existing irrigation logic keeps running exactly as it does today.
Signal
Coverage Area
5Km Distance
Max Nodes
Connection
300 Nodes
High Mountains
Desert Edge

Remote Areas

Deep Valleys
图文展示

PAIN 01

You can't trench everywhere

Scattered fields, slopes, existing pipes.

Trenching means downtime, contractors, and a permanent

scar across your land — often for a single zone.


ABUIABAEGAAgvrPL1wYogMev5wEwrAI40QE
图文展示(1)

PAIN 02

You can't replace your PLC.

You already have PLCs, HMIs, and control cabinets that work.

The last thing you need is a closed system that

forces your team to start over.


ABUIABAEGAAgvbPL1wYorL6h5AQwjQI4zAE
TWO WALLS STOP
MOST OF THE FARM AUTOMATION PROJECTS

LoRaWAN solves the first. Modbus TCP solves the second.



HOW IT WORKS? The wireless part stays in the field. The standard part stays in your control cabinet. Only need 3 steps

① Deploy filed Nodes
② Connect to Gateway
③ Point your PLC to it

BUILT FOR RECOMMENDED,
NOT JUST INSTALLED
You bring the project.We make sure your technical review passes on the first pass
.
01
02
03
04
Save on wiring, not on capability

Save on wiring, not on capability

Add a new zone by mounting a node and binding an ID — not by digging a trench and waiting for a contractor.

Addressing you can calculate

Addressing you can calculate

Channel numbers follow a fixed rule: device ID × 4 + port number. Your PLC engineer can derive every point independently — no mapping table to request, no vendor in the loop.

Full Certifications for Customs

Full Certifications for Customs

CE, FCC, RoHS, IP67. Regional LoRaWAN variants for US 915 MHz, EU 868 MHz, AU, and LATAM. Certification documents ship with the order

Irrigation continues offline

Irrigation continues offline

Control logic runs locally. When the internet drops, the valves keep working.

FAQ
Questions buyers actually ask
Do I need to replace my PLC or SCADA?
What happens when the internet goes down?
How long does a valve take to move?
Do you support installation and commissioning?
No. The gateway is a standard Modbus TCP Server. Your existing controller reads it like any other device.
ocal irrigation continues. Your PLC logic and field nodes are independent of the cloud.
45–90 seconds depending on valve type. Write commands are acknowledged instantly, but confirm actual position from the status register.
Yes. Remote commissioning support is included. On-site commissioning is available for projects above an agreed valve count.